KRAFT PAPER PROJECT 2020
The year of 2020-during Covid19 time, TLC completed the Kraft Paper Plant project.
The scope of work is installation services for electrification systems (Power supply-Drives-Control and Instrument).
Project duration is 4-6 months, TLC mobilized 150 men in peak time.
The details are as below:
- Transformer: 14 sets
- MV, LV SWGs: 60 sets
- LV MCC: 80 sets
- Cable raceway: ladder, tray, conduits
- MV-LV-C&I Cabling works: 500,000m
- Cable termination: 10,000 ends
- Instrumentation tube: 5,000m
- Pneumatic tube: 20,000m
- Supporting T&C works.