Phu My 3 CCPP

Project information:

Phu My 3 Power Plant, 720MW Combined Cycle Power Plant,

Owner: BP Holding, Sembcorp Utilities, Kyushu Electric Power Co., Incvà Nissho Iwai

The EPC contractor for Power Island: Siemens Power Generation(SPG)

 

Tuyen Lam scope of works:

  1. Installation of  power transformer 220kV/300MW
  2. Supply, installation of earthing & lightning protection system
  3. Supplying, installing and commissioning for sump- pump systems
  4. Supply Equipment and installation the disconnector cabinet (Withdrawable unit RADG11-AOA-315A)

 

Doing connection of cable-transformer 250MVA-500KV-1

Doing connection of cable-transformer 250MVA-500KV-2

Doing connection of cable-transformer 250MVA-500KV-3

Maintenance of 500KV Swichgear Yard

Providing complete set of Sump Pump for Cable Tunels-Sump Pump and Control Cabinet

Renew the cable raceway systems-1

Renew the cable raceway systems-2

TLC working in Phu My 3 CCPP

Working in Oil Station

 

Related news

CJFM-EC&I PROJECT

TLC got the contract of provision of Electrical, control and instrument systems for new plant...

FULIN-PROVISION, INSTALLATION AND COMMISSIONING...

TLC has provided the control panels for Fire Fighting pumps systems in plant...

PHU MY 3 CCPP-OUTAGE 2018

Discussion with Siemens specialists before executing at job...

CUSTOMERS-PROJECT