KRAFT PAPER PROJECT 2020

The year of 2020-during Covid19 time, TLC completed the Kraft Paper Plant project.

The scope of work is installation services for electrification systems (Power supply-Drives-Control and Instrument).

Project duration is 4-6 months, TLC mobilized 150 men in peak time.

The details are as below:

  • Transformer: 14 sets
  • MV, LV SWGs: 60 sets
  • LV MCC: 80 sets
  • Cable raceway: ladder, tray, conduits
  • MV-LV-C&I Cabling works: 500,000m
  • Cable termination: 10,000 ends
  • Instrumentation tube: 5,000m
  • Pneumatic tube: 20,000m
  • Supporting T&C works.

 

Related news

REVAMPING THE DRIVE SYSTEMS FOR PAPER MACHINE

REVAMPING THE DRIVE SYSTEMS FOR PAPER MACHINE

MECHANICAL SERVICE FOR MEGA STEEL PROJECT

MECHANICAL SERVICE FOR MEGA STEEL...

MINING – EC&I PROJECT

TLC is serving An International Project Team - The Mining Project.....

RENOVATION NBJ PROJECT FOR PAPER PLANT

TLC just completed NBJ project for Paper Plant in Collaboration Biz Model with OEM contractor ...

SPEED UP PROGRESS FOR C&I DCS OF PAPER MACHINE

The Paper Machine is going to Commissioning stage, TLC is speeding up the progress of installation...

THE COGEN 30MW PROJECT IN ACCELERATION STAGE

After the Covid 19 4th booming in South of Vietnam, TLC accelerating the Co-Generation 30MW...

CUSTOMERS-PROJECT

zalo