VINH TAN THERMAL POWER PLANT

Installation of MV SWG, MCC, cable raceway, pulling, terminating E C&I...

VINH TAN 4 TPP EXT. IN PRE-COMMISSIONING STAGE

Vinh Tan 4 TPP Ext is in pre-commissioning progress...

INSTALLATION OF 500KV CTS FOR 500KV POWER STATION...

TLC got the contract of provision of materials and installation of foundation,...

PHU MY 3 CCPP-OUTAGE 2018

Discussion with Siemens specialists before executing at job...

FULIN-PROVISION, INSTALLATION AND COMMISSIONING...

TLC has provided the control panels for Fire Fighting pumps systems in plant...

VKPC MSD2018-MAINTENANCE SERVICE FOR MV SWG, MV...

Early October 2018, VKPC carried out Major Shutdown for yearly outage...

FULIN PLASTIC PLANT

Upgrading the systems of Power, Drives, Control of production lines: provision,...

INSTALLING SFC FOR COMBINED CYCLE POWER PLANT...

TLC got the contract of provision of materials and installation of SFC systems...