INSTALLATION OF 500KV CTS FOR 500KV POWER STATION OF COMBINED CYCLE POWER PLAN (CCPP)
TLC got the contract of provision of materials and installation of foundation, steel structure, 500KV CT for 500KV power station of Combined Cycle Power Plan (CCPP).
The detailed scope of works consists of:
- Provision of concrete foundation
- Provision of steel structure
- Installation of 500KV CTs
- Installation and termination of power and control, instrument cables
- Testing and commissioning system.
Reference pictures
500KV CT project Kick Off Meeting
TLC daily Tool Box Meeting-01
TLC daily Tool Box Meeting-02
TLC daily Tool Box Meeting-03
TLC daily Tool Box Meeting-04
TLC daily Tool Box Meeting-05
Surveying and positioning activities for foundation works- 01
Surveying and positioning activities for foundation works-02
Surveying and positioning activities for foundation works-03
Surveying and positioning activities for foundation works-04
Surveying and positioning activities for foundation works-05
Fabrication of steel structures at workshop-01
Fabrication of steel structures at workshop-02
Fabrication of steel structures at workshop-03
Fabrication of steel structures at workshop-04
Fabrication of steel structures at workshop-05
Trial assembling structures at workshop after completed Hot Dip Galvanized statge-01
Trial assembling structures at workshop after completed Hot Dip Galvanized statge-02
Trial assembling structures at workshop after completed Hot Dip Galvanized statge-03
Trial assembling structures at workshop after completed Hot Dip Galvanized statge-04
Trial assembling structures at workshop after completed Hot Dip Galvanized statge-05
Trial assembling structures at workshop after completed Hot Dip Galvanized statge-06
Factory Acceptance Inspection (FAI) at workshop before delivering to construction site-01
Factory Acceptance Inspection (FAI) at workshop before delivering to construction site-02
Factory Acceptance Inspection (FAI) at workshop before delivering to construction site-03
Delivering steel structures to job site-01
Delivering steel structures to job site-02
Delivering steel structures to job site-03
Delivering steel structures to job site-04
Related news
TLC IN PAPER PLANT PROJECTS
TLC IN PAPER PLANT...
TLC IN POWER PLANT PROJECTS
TLC IN POWER PLANT PROJECTS
REVAMPING THE DRIVE SYSTEMS FOR PAPER MACHINE
REVAMPING THE DRIVE SYSTEMS FOR PAPER MACHINE
MECHANICAL SERVICE FOR MEGA STEEL PROJECT
MECHANICAL SERVICE FOR MEGA STEEL...
MINING – EC&I PROJECT
TLC is serving An International Project Team - The Mining Project.....
RENOVATION NBJ PROJECT FOR PAPER PLANT
TLC just completed NBJ project for Paper Plant in Collaboration Biz Model with OEM contractor ...
+84(0)91 587 6679