INSTALLATION OF 500KV CTS FOR 500KV POWER STATION OF COMBINED CYCLE POWER PLAN (CCPP)

TLC got the contract of provision of materials and installation of foundation, steel structure, 500KV CT for 500KV power station of Combined Cycle Power Plan (CCPP).

The detailed scope of works consists of:

  • Provision of concrete foundation
  • Provision of steel structure
  • Installation of 500KV CTs
  • Installation and termination  of power and control, instrument cables
  • Testing and commissioning system.

Reference pictures

500KV CT project Kick Off Meeting

TLC daily Tool Box Meeting-01

TLC daily Tool Box Meeting-02

TLC daily Tool Box Meeting-03

TLC daily Tool Box Meeting-04

TLC daily Tool Box Meeting-05

Surveying and positioning activities for foundation works- 01

Surveying and positioning activities for foundation works-02

Surveying and positioning activities for foundation works-03

Surveying and positioning activities for foundation works-04

Surveying and positioning activities for foundation works-05

Fabrication of steel structures at workshop-01

Fabrication of steel structures at workshop-02

Fabrication of steel structures at workshop-03

Fabrication of steel structures at workshop-04

Fabrication of steel structures at workshop-05

Trial assembling structures at workshop after completed Hot Dip Galvanized statge-01

Trial assembling structures at workshop after completed Hot Dip Galvanized statge-02

Trial assembling structures at workshop after completed Hot Dip Galvanized statge-03

Trial assembling structures at workshop after completed Hot Dip Galvanized statge-04

Trial assembling structures at workshop after completed Hot Dip Galvanized statge-05

Trial assembling structures at workshop after completed Hot Dip Galvanized statge-06

Factory Acceptance Inspection (FAI) at workshop before delivering to construction site-01

Factory Acceptance Inspection (FAI) at workshop before delivering to construction site-02

Factory Acceptance Inspection (FAI) at workshop before delivering to construction site-03

Delivering steel structures to job site-01

Delivering steel structures to job site-02

Delivering steel structures to job site-03

Delivering steel structures to job site-04

 

Related news

MECHANICAL SERVICE FOR MEGA STEEL PROJECT

MECHANICAL SERVICE FOR MEGA STEEL...

MINING – EC&I PROJECT

TLC is serving An International Project Team - The Mining Project.....

RENOVATION NBJ PROJECT FOR PAPER PLANT

TLC just completed NBJ project for Paper Plant in Collaboration Biz Model with OEM contractor ...

SPEED UP PROGRESS FOR C&I DCS OF PAPER MACHINE

The Paper Machine is going to Commissioning stage, TLC is speeding up the progress of installation...

THE COGEN 30MW PROJECT IN ACCELERATION STAGE

After the Covid 19 4th booming in South of Vietnam, TLC accelerating the Co-Generation 30MW...

LUB OIL BLENDING PLANT

TLC is executing the project of “LUB OIL BLENDING PLANT”. The scope of works are:...

CUSTOMERS-PROJECT

zalo