VINH TAN THERMAL POWER PLANT
Project: The 600MW Thermal Power Plant-Vĩnh Tân 4 Extension
Scope of works: Installation of MV SWG, MCC, cable raceway, pulling, terminating E C&I cables to Electrical Equipment (MV, LV cubicles, instrumentation devices, control devices)
Schedule: Ongoing
The Engineers, Workers of TLC have closely cooperated with Experts, Engineers of EPC contractor, worked hard to complete the works of fabrication, installation, testing and commissioning equipment in accordance with Customers’s desired schedules.
TLC team at Vinh Tan Power Plant-01
TLC team at Vinh Tan Power Plant-02
Cable termination for OLTC panels of 650MVA-500KV transformer
Installing cable ladder, tray for boiler at EL62,000
Cable termination for DCS panels in Control Room
Cable termination for LV MCC
Cable terminations with proper: connections, sleeve, marking, labeling, glanding-01
Cable terminations with proper: connections, sleeve, marking, labeling, glanding-02
Cable terminations with proper: connections, sleeve, marking, labeling, glanding-03
Cable termination in Junction Box (JB)
Proper cable entries to panel with: cable gland, cable support, cable ties, cable marker
Vinh Tan 4 Extension Power Plant-Picture taken on 25 April 2018
Cables termination in MV SWG room-01
Cables termination in MV SWG room-02
Fabricating HDG support in site workshop
Installing cable tray for Boiler at EL27,000-01
Installing cable tray for Boiler at EL27,000-02
Prepare for cable pulling works at cable racks on Pipe Bridge
Cable termination works for PT, CT at 500KV Switch Yard
Cable termination for LV MCC at EE room
Prepare for cable pulling works at Boiler 1
Prepare for cable pulling works at Boiler 2
Pulling cables in Cable Room
Arranging cables for pulling works
Pulling cables at Step-up transformer ares
Cable drums unloading at job site
Installing cable raceway supports at Boiler
Installing risers at Boiler
Installation of MV SWG
Cables termination for LV MCC
Checking proper PPE before starting the work everyday
Working with proper scaffolding systems (tubular type)
Watchmen standby while working in cable manhole (Confined spaces)
Air fan for ventilation while working in confined spaces
Working with proper mobile scaffolding
Barricades for openings on the floor
Installing HDG supports for cable manhole in ductbank
Installing MV panels by using crane
Cabling works for coal grinders
Cable tray and cable ladders installed at boiler
Fabricating and welding HDG supports
Installing cable trays to manhole
Cabling works for service transformers
Using proper supports for cable drum pulling
Using proper rollers for cable pulling works
Meeting the friends at site-01
Meeting the friends at site-02
Safety Induction
Fire Fighting training at site-01
Fire Fighting training at site-02
Installing the cable tray at Boiler
Working place-Boiler-01
Working place-Boiler-02
Installing cabe raceway for Boiler
TLC peolpe working at job site-01
TLC peolpe working at job site-02
TLC peolpe working at job site-03
TLC peolpe working at job site-04
TLC peolpe working at job site-05
Fabricating HDG steel supports at job site
Assembling HDG cable tray at job site
Loading the cable tray into the lift up to heights of Boiler-01
Loading the cable tray into the lift up to heights of Boiler-02
Related news
TLC IN PAPER PLANT PROJECTS
TLC IN PAPER PLANT...
TLC IN POWER PLANT PROJECTS
TLC IN POWER PLANT PROJECTS
REVAMPING THE DRIVE SYSTEMS FOR PAPER MACHINE
REVAMPING THE DRIVE SYSTEMS FOR PAPER MACHINE
MECHANICAL SERVICE FOR MEGA STEEL PROJECT
MECHANICAL SERVICE FOR MEGA STEEL...
MINING – EC&I PROJECT
TLC is serving An International Project Team - The Mining Project.....
RENOVATION NBJ PROJECT FOR PAPER PLANT
TLC just completed NBJ project for Paper Plant in Collaboration Biz Model with OEM contractor ...
+84(0)91 587 6679