VINH TAN THERMAL POWER PLANT

Project: The 600MW Thermal Power Plant-Vĩnh Tân 4 Extension
Scope of works: Installation of MV SWG, MCC, cable raceway, pulling, terminating E C&I cables to Electrical Equipment (MV, LV cubicles, instrumentation devices, control devices)  
Schedule: Ongoing


The Engineers, Workers of TLC have closely cooperated with Experts, Engineers of EPC contractor, worked hard to complete the works of fabrication, installation, testing and commissioning equipment in accordance with Customers’s desired schedules.

TLC team at Vinh Tan Power Plant-01

TLC team at Vinh Tan Power Plant-02

Cable termination for OLTC panels of 650MVA-500KV transformer

Installing cable ladder, tray for boiler at EL62,000

Cable termination for DCS panels in Control Room

Cable termination for LV MCC

Cable terminations with proper: connections, sleeve, marking, labeling, glanding-01

Cable terminations with proper: connections, sleeve, marking, labeling, glanding-02

Cable terminations with proper: connections, sleeve, marking, labeling, glanding-03

Cable termination in Junction Box (JB)

Proper cable entries to panel with: cable gland, cable support, cable ties, cable marker

Vinh Tan 4 Extension Power Plant-Picture taken on 25 April 2018

Cables termination in MV SWG room-01

Cables termination in MV SWG room-02

Fabricating HDG support in site workshop

Installing cable tray for Boiler at EL27,000-01

Installing cable tray for Boiler at EL27,000-02

Prepare for cable pulling works at cable racks on Pipe Bridge

Cable termination works for PT, CT at 500KV Switch Yard

Cable termination for LV MCC at EE room

Prepare for cable pulling works at Boiler 1

Prepare for cable pulling works at Boiler 2

Pulling cables in Cable Room

Arranging cables for pulling works

Pulling cables at Step-up transformer ares

Cable drums unloading at job site

Installing cable raceway supports at Boiler

Installing risers at Boiler

Installation of MV SWG

Cables termination for LV MCC

Checking proper PPE before starting the work everyday

Working with proper scaffolding systems (tubular type)

Watchmen standby while working in cable manhole (Confined spaces)

Air fan for ventilation while working in confined spaces

Working with proper mobile scaffolding

Barricades for openings on the floor

Installing HDG supports for cable manhole in ductbank

Installing MV panels by using crane

Cabling works for coal grinders

Cable tray and cable ladders installed at boiler

Fabricating and welding HDG supports

Installing cable trays to manhole

Cabling works for service transformers

Using proper supports for cable drum pulling

Using proper rollers for cable pulling works

Meeting the friends at site-01

Meeting the friends at site-02

Safety Induction

Fire Fighting training at site-01

Fire Fighting training at site-02

Installing the cable tray at Boiler

Daily Tool Box Talk in the morning

Working place-Boiler-01

Working place-Boiler-02

Installing cabe raceway for Boiler

TLC peolpe working at job site-01

TLC peolpe working at job site-02

TLC peolpe working at job site-03

TLC peolpe working at job site-04

TLC peolpe working at job site-05

Fabricating HDG steel supports at job site

Assembling HDG cable tray at job site

Loading the cable tray into the lift up to heights of Boiler-01

Loading the cable tray into the lift up to heights of Boiler-02

 

 

 

 

Related news

TLC IN PAPER PLANT PROJECTS

TLC IN PAPER PLANT...

TLC IN POWER PLANT PROJECTS

TLC IN POWER PLANT PROJECTS

REVAMPING THE DRIVE SYSTEMS FOR PAPER MACHINE

REVAMPING THE DRIVE SYSTEMS FOR PAPER MACHINE

MECHANICAL SERVICE FOR MEGA STEEL PROJECT

MECHANICAL SERVICE FOR MEGA STEEL...

MINING – EC&I PROJECT

TLC is serving An International Project Team - The Mining Project.....

RENOVATION NBJ PROJECT FOR PAPER PLANT

TLC just completed NBJ project for Paper Plant in Collaboration Biz Model with OEM contractor ...

CUSTOMERS-PROJECT

zalo