50MWP SOLAR FARM
50Mwp Solar Power Farm in 2018-2019.
TLC is Contractor for Electrification works for 50MWp Solar Farm in Tay Ninh.
The scope of works: Provision of installation materials and installation, Testing and Commissioning services.
- 22/110KV-63MVA step up Station.
- Power Control Station (PCS) 6MVA each.
- DC 1500V cables. - AC 22KV cable
- Lighting and Lightning systems.
Timelines: from 2018 October to 2019 June.
1. TLC Office

2. TLC division at TTC2-50MWp project

3. 110KV substation

4. 110KV substation installation

5. Supports installation

6. PV Panels installation

7. PV panels installation

8. PV Panels installation

9. DC cable termination in PCS

10. DC cables terminating

11. Power cable installation

12. Power cable pulling

13. Utility instllation

14. Utility instllation

15. On site with Sun

16. Tool Box Meeting

17. Relaxxing

18. This is really Green Power

Related news
+84(0)91 587 6679
Featured news
CUSTOMERS-PROJECT



(1).png)



.jpg)



.jpg)
.jpg)
.jpg)




.jpg)

.jpg)