50MWP SOLAR FARM

50Mwp Solar Power Farm in 2018-2019.

TLC is Contractor for Electrification works for 50MWp Solar Farm in Tay Ninh.

The scope of works: Provision of installation materials and installation, Testing and Commissioning services.

- 22/110KV-63MVA step up Station.

- Power Control Station (PCS) 6MVA each.

- DC 1500V cables. - AC 22KV cable

- Lighting and Lightning systems.

Timelines: from 2018 October to 2019 June.

1. TLC Office

2. TLC division at TTC2-50MWp project

3. 110KV substation

4. 110KV substation installation

5. Supports installation

6. PV Panels installation

7. PV panels installation

8. PV Panels installation

9. DC cable termination in PCS

10. DC cables terminating

11. Power cable installation

12. Power cable pulling

13. Utility instllation

14. Utility instllation

15. On site with Sun

16. Tool Box Meeting

17. Relaxxing

18. This is really Green Power

 

Related news

THE ROOFTOP SOLAR SYSTEM FOR PLASTIC INDUSTRY

THE ROOFTOP SOLAR SYSTEM FOR PLASTIC...

THE ROOFTOP SOLAR SYSTEM – MECHANICAL FACTORY

Early 2024, TLC completed the project of Rooftop Solar System with installed capacity of 920Kwp for...

THE ROOFTOP SOLAR SYSTEM – MECHANICAL FACTORY

TLC has completed the EPC contract for Rooftop Solar System with installed capacity of 1000Kwp for...

THE ROOFTOP SOLAR SYSTEM – GARMENT FACTORY

TLC has completed the EPC contract for Rooftop Solar System for Garment factory...

ROOFTOP SOLAR ENERGY SYSTEM - FOOD PROCESSING...

TLC accompanies the Investment Fund to cooperate in developing rooftop solar energy systems for...

CUSTOMERS-PROJECT

zalo