INSTALLATION OF 22/110KV-63MVA SUB-STATION
TLC INSTALLS THE 22/110KV-63MVA SUB-STATION
TLC is installing the Step-up transformer sub-station 22/110KV-63MVA for TTC2 Solar power plant.
The scope of work consists of:
- Installation of step-up transformer 22/110KV-63MVA.
- Installation of primary-secondary component in switch yard.
- Installation of primary-secondary power panels and control panels in control building.
- Oil filtering works.
- Testing and Commissioning the substation.
Below pictures are taken during sub-station installation progress:
Istallation of Primary-Secondary equipments in switch yard: CB, DS, PT, CT, SA…
Installation of MV, LV, Control panels in Control Building
Overview of 22/110KV-2x63MVA sub-station
Installation of transformer 22/110KV-63MVA
The preparation and oil filtering in progress
Istallation of Promary-Secondary equipments in switch yard