PROVIDE THE BACKUP INVERTER FOR CRANE AT THE PORT OF CEMENT PLANT
Owner: Cam Pha Cement Grinding Plant
Location: My Xuan, Tan Thanh, Ba Ria-Vung Tau, Vietnam
System description:
TLC provided the solution of backup Inverter and Control/Automation systems for import crane at the port of Cam Pha Cement Grinding Plant
TLC executed the works while the existing systems are in normal operation, the installation, testing and commissioning works had been carried out in limited time, required precise co-operation skills.
TLC SOLUTION
1. Hoisting gear
- Hoisting gear M01): type K22F 355L 4B FBI HB IGR IL LL NSPTTWS HW (VEM)
- Motor: Rated power: 500kw-380vac-50hz-1490rpm-994A-2 poles
- Cable length: 25m
- Roller dimension: 1250mm
- Lifting cable’s dimension: 44mm
- Motor drive: Inverter, build in panels
2. Control systems
- PLC: S7-400
- Inverter: ABB
- Power cables, control cables, cable connection systems
Below pictures are taken during execution of project:
Design and build Inveter panels at workshop
Transpport Inveter panel to installing position
Install systems at the port
Testing and Commissioning activities
Related news
SILO MONITORING AND MANAGEMENT FOR FLOUR MILL
TLC provide the Supervision and Management Solution for Solos storing Wheat for Flour Mill. Used...
PROVIDE 500KW INVERTER FOR CRANE AT THE PORT OF...
TLC provided the solution of backup Inverter and Control/Automation systems for import crane at the...
SILO MONITORING AND MANAGEMENT
TLC PROVIDED THE MONITORINGA AND MANAGEMENT SOLUTION FOR SILO BY USING RADAR SENSOR
FULIN-PROVISION, INSTALLATION AND COMMISSIONING...
TLC has provided the control panels for Fire Fighting pumps systems in plant...
+84(0)91 587 6679