VKPC - PM1

Vina Kraft Paper Company

Project information:

Vina Kraft Paper Company

The Owner: SCG Paper Group with capacity of 220,000 tons/year.

Tuyen Lam scope of works:

  • 2008-2009: installation of DCS systems, electrification systems for ESP, auxiliary systems during construction phase (cubicles, cable systems…)
  • 2010-2012: several jobs of modification, extension. Maintenance for all HVAC systems. Maintenance for MV, LV Switchgear.
  • 2009- 2013: Maintenance for MV, LV Switchgear. Installation of electrification systems for Fenton, Debottleneck&Size Press, and other several  projects.
  • 2016: Local contractor for provision of cable raceway systems and installation, testing and commissioning the electrification systems with Siemens Group .

Cable connection in Electric Panel

Cable connection in LV MCC

Cable connections for motor

Cable termination in MCC

Cogen complex in construction

ETP in commissioning stage

Installation of Electrical systems for pumps at Chemical Plant

Installing the control valves

Installing the field transmiter

Installing the Pneumatic Systems

Moving 6.6KV motor

Paper on reel

Relocation of 6.6KV motors

T&C works for motor

 

 

Related news

MINING – EC&I PROJECT

TLC is serving An International Project Team - The Mining Project.....

RENOVATION NBJ PROJECT FOR PAPER PLANT

TLC just completed NBJ project for Paper Plant in Collaboration Biz Model with OEM contractor ...

SPEED UP PROGRESS FOR C&I DCS OF PAPER MACHINE

The Paper Machine is going to Commissioning stage, TLC is speeding up the progress of installation...

THE COGEN 30MW PROJECT IN ACCELERATION STAGE

After the Covid 19 4th booming in South of Vietnam, TLC accelerating the Co-Generation 30MW...

LUB OIL BLENDING PLANT

TLC is executing the project of “LUB OIL BLENDING PLANT”. The scope of works are:...

SUPPLY AND SERVICES FOR STEEL PLANT

TLC  is contractor for providing the 22KV Circuit Breaker panel and service of installation,...

CUSTOMERS-PROJECT

zalo